Category Archives: Manufacturing + Warehouse

Kurita

The new precast facility building’s Japanese influence can be seen in its clean simplicity. Beautiful epoxy sealed floors and fresh paint throughout continue throughout the labs, offices, and warehouse of this 156,000 square foot project.

Cool Offices: Kurita America uses Japanese influence in new Twin Cities building

General Contractor: Ryan Companies
Project Manager: Bob Wymore / Superior Painting & Decorating, Inc.

Photos by Steve Silverman

Terex Facility

New construction of a 446,547 SF facility approximately two miles from Terex’s existing operation. This facility will co-locate all manufacturing and corporate operations with the exception of steel fabrication. General make-up of the facility is strip footings, steel structure, exterior precast/metal panel/storefront glass. A heavy MEP focus on utilities is required for the equipment and manufacturing operations. Also include in the project is a large asphalt and concrete pavement areas for parking and trucking haul roads.

Architect: ISG – LaCrosse, WI
General Contractor: McGough Construction
Project Manager: Bob Wymore / Superior Painting & Decorating, Inc.

Renewal by Anderson

Renewal by Andersen Headquarters Facility Expansion

The Ribbon Cutting Ceremony held June 30, 2016 celebrated the Grand Opening and completion of this 113,000 sf expansion of the Renewal by Andersen Headquarters located in Cottage Grove, MN.

Superior Painting & Decorating, Inc was pleased to be a part of this major renovation; the first expansion project for Renewal by Andersen since moving to this location in 1999. Working under the direction of McGough Construction and RSP Architects, finishes utilized on this project included:

Manufacturing Area (185,000 sf)
Painting of steel truss/bar joist and deck ceiling using a spray application of 3000 gal of Dry-Fall, concrete ceiling and pre-cast walls using aerial lift equipment at 27’ height.
Industrial enamels applied to Manufacturing steel stairs, bollards, and columns throughout.

Office space (33,000 sf)
Interior paint finishes included a mix of Accent Colors along with Epoxy paint finishes applied at Locker Room Area.

Watch the Ribbon Cutting Ceremony >