Terex Facility

New construction of a 446,547 SF facility approximately two miles from Terex’s existing operation. This facility will co-locate all manufacturing and corporate operations with the exception of steel fabrication. General make-up of the facility is strip footings, steel structure, exterior precast/metal panel/storefront glass. A heavy MEP focus on utilities is required for the equipment and manufacturing operations. Also include in the project is a large asphalt and concrete pavement areas for parking and trucking haul roads.

Architect: ISG – LaCrosse, WI
General Contractor: McGough Construction
Project Manager: Bob Wymore / Superior Painting & Decorating, Inc.

  • Location: Watertown, SD
  • Completed On: 10/5/20
  • Project Size: 446,547 SF
  • Service Type: Wall Covering / Interior/Exterior Painting